Optimistic rollup with a permissioned sequencer and fault proofs.

An Ethereum Layer 2 that posts transaction batches to L1, settles withdrawals after a challenge window and exposes a canonical bridge. The sequencer is operated by a single entity with a forced-inclusion path on L1.

Ecosystem
ETHEthereum
Category
Layer 2
Languages
Solidity, Go
Launched
Aug 2025
83.0AModerate risk

Grade A · Moderate risk

Sound posture; some improvements recommended.

+3.9 since Nov 2025 · −0.4 since Jul 2026

Quantix Protocol Research · as of 24 Oct 2026 · About this data

Risk Index

How the score is built

Six weighted components, each scored 0–100 where higher means less risk. Points are the component value multiplied by its weight; the gap is what the component costs against a perfect score.
ComponentWeightValuePointsGap
Code Security30%8625.8−4.2
Operational Security20%8016.0−4.0
Governance Risk15%7611.4−3.6
Economic Security15%8412.6−2.4
Infrastructure Resilience10%828.2−1.8
Transparency10%909.0−1.0
Quantix Risk Index100%83.0−17.0
CodeOperationalGovernanceEconomicInfrastructureTransparencyObsidian Rollup, Code: 86Obsidian Rollup, Operational: 80Obsidian Rollup, Governance: 76Obsidian Rollup, Economic: 84Obsidian Rollup, Infrastructure: 82Obsidian Rollup, Transparency: 90
Risk Index components: Obsidian Rollup Code 86, Operational 80, Governance 76, Economic 84, Infrastructure 82, Transparency 90
ComponentObsidian Rollup
Code86
Operational80
Governance76
Economic84
Infrastructure82
Transparency90

Grade scale

  1. AAA90–100
  2. AA85–89.9
  3. A80–84.9
  4. BBB75–79.9
  5. BB70–74.9
  6. B65–69.9
  7. CCC60–64.9
  8. CC55–59.9
  9. C50–54.9
  10. D0–49.9

Score history

12 monthly snapshots

Each point is the Risk Index computed from that month’s component values. Markers below the chart show the events that moved a component.
Obsidian Rollup Quantix Risk Index by month
PeriodQuantix Risk Index
Nov ’2579.1
Dec ’2579.1
Jan ’2681.3
Feb ’2683.4
Mar ’2683.4
Apr ’2683.4
May ’2683.4
Jun ’2683.4
Jul ’2683.4
Aug ’2683.4
Sep ’2682.2
Oct ’2683.0
  1. 6 Oct 2026

    Operations

    Administrator keys rotated

    Keys moved to hardware security modules with new signers.

    • Operational Security+4
  2. 14 Sept 2026

    Incident analysis

    Compromised upgrade signers schedule a malicious Portal upgrade

    Two of three upgrade-multisig keys were taken from a CI-connected signing host; the timelock gave responders 48 hours and they needed three.

    Incident analysis in Threat Analysis
    • Operational Security−6
  3. 17 Feb 2026

    Upgrade

    Permissionless fault proofs enabled

    Anyone can challenge proposed outputs.

    • Code Security+5
    • Governance Risk+4
  4. 9 Jan 2026

    Research assessment

    Research assessment completed: Protocol Architecture Review

    9 findings (1 critical, 1 high, 4 medium, 2 low, 1 informational). All critical and high findings addressed.

    Read the research assessment
    • Code Security+6
    • Transparency+4

Risk factors

What keeps the score from being higher, most severe first.
  • HighGovernance RiskProfile analysis

    Broad emergency upgrade path

    The council can replace bridge and proof contracts immediately, bypassing the exit window users rely on.

  • MediumInfrastructure ResilienceProfile analysis

    Centralised sequencing

    A single sequencer can delay transactions and degrade liveness; forced inclusion mitigates censorship but not latency.

  • LowCode SecurityFrom the research assessment

    1 lower-severity finding not fully resolved

    Medium, low or informational findings remain open or partially resolved in the research assessment.

Recommendations

Each recommendation raises one component to a target value. The score effect is recomputed with the Risk Index model, holding every other component fixed.
  • Governance Risk: 76 → 84

    Narrow the emergency path

    Limit no-delay actions to pausing; route all logic changes through the 8-day path.

    +1.2

    → 84.2

  • Infrastructure Resilience: 82 → 88

    Sequencer failover

    Operate a second sequencer with automatic failover and published liveness metrics.

    +0.6

    → 83.6

Analysis

Contract, governance and operations

Contract analysis

Source
Verified
Upgradeability
L1 contracts upgradeable by the security council
Administrative control
4-of-7 security council; 8-day delay for standard upgrades since September 2026, none for emergencies
Enforced delay
192 hours
External dependencies
Single sequencer operator; Ethereum L1 data availability
  • PassFault proofs. Permissionless bisection fault proofs on output roots.
  • PassForced inclusion. Users can force transactions through L1 if censored.
  • CautionSequencer. One operator orders all transactions.
  • CautionEmergency upgrades. The council can upgrade without delay in an emergency.

Governance exposure

Moderate

Standard upgrades wait eight days; the emergency path is broad and executes immediately.

Operational resilience

Adequate

Upgrade-administrator keys were rotated to hardware after the September incident.

Monitoring

Monitoring history

9 recorded security events for Obsidian Rollup, most recent first.
  1. 16 Sept 2026MediumPortal upgrade delay raised from 48 hours to 8 daysConfiguration Change · UpgradeTimelockResolved
  2. 15 Sept 2026MediumWithdrawal finalisation resumedConfiguration Change · PortalResolved
  3. 14 Sept 2026HighUpgrade multisig owners rotatedAccess Control · Upgrade multisigResolved
  4. 14 Sept 2026LowSecurity council cancels the scheduled upgradeGovernance · UpgradeTimelockResolved
  5. 14 Sept 2026MediumWithdrawal finalisation paused by the guardianConfiguration Change · PortalResolved
  6. 14 Sept 2026CriticalPortal upgrade scheduled to an unapproved implementationProxy Upgrade · UpgradeTimelockResolved

Research assessment

QX-TSA-2026-008Protocol Architecture ReviewPublished

L1 rollup contracts (batch inbox, output oracle, dispute game, portal), the v2 upgrade and the Go sequencer and batcher. 4,310 nSLOC.

Review 1 Dec 2025 – 9 Jan 2026 · published 5 Feb 2026

Critical1
High1
Medium4
Low2
Informational1
  • 7 resolved
  • 1 partially resolved
  • 1 acknowledged
  • 0 open

Continue with

Comparable protocols

Compare side by side

Research

Relevant research

Publications on the risks that matter most for a layer 2 protocol.

Architecture

System components

BatchInbox
Receives compressed batches from the sequencer
OutputOracle
Stores proposed L2 state roots
DisputeGame
Bisection fault proofs over disputed outputs
Portal
Deposits, withdrawal proving and finalisation
Sequencer (Go)
Orders transactions and builds batches

Turn risk factors into a remediation plan.

A research assessment traces each weakness to code, configuration or process, and verifies the fix before the score moves.